SEASONAL ASSESSMENT OF RUN-OF-RIVER HYDROELECTRIC POWER PLANT RAMP EVENTS
Abstract
This study aims to seasonally examine run-of-river type hydroelectric power plants' ramp rates (generation changes) (RoRHPP). Turkey RoRHPP generations were obtained for this objective between 01 December 2020 and 01 December 2021. Obtained data are hourly resolution and belong to 560 plants. The total installed power of the plants used in work is 7897.06 MW. This study used histogram fields to examine ramp rates of 5%, 7.5%, and 10% of the installed power in 1, 3, and 6-hour periods. As a result of the investigations, the cumulative histogram areas of the ramps of 5% and above in 6 hours temporal periods of the spring, summer, autumn, and winter seasons were calculated as 39430.94, 22117.72, 17811.76, and 34914.32, respectively. When these ramps are evaluated according to their directions, the histogram areas of positive ramp (generation increase) in spring, summer, autumn, and winter are 20052.1, 10945.74, 9095.8, and 17303.19, respectively. The histogram areas of the negative ramps (reduction of generation) in spring, summer, autumn, and winter are 19378.84, 11171.98, 8715.96, and 17611.13, respectively. According to all these results, ramp events in Turkey's RoRHPP productions occurred the most in the spring. In addition, It was also concluded that positive ramp events occurred more in all seasons.
Keywords
References
- Andritz Hydro. (2015). Mini compact hydro. https://www.andritz.com/resource/blob/33256/4cc3cf70a02bca500e3c8e0915b31c03/hy-mini-compact-brochure-en-data.pdf
- Aylık Elektrik Üretim-Tüketim Raporları. (n.d.). Retrieved April 26, 2022, from https://www.teias.gov.tr/tr-TR/aylik-elektrik-uretim-tuketim-raporlari
- Bilgili, M., Bilirgen, H., Ozbek, A., Ekinci, F., & Demirdelen, T. (2018). The role of hydropower installations for sustainable energy development in Turkey and the world. Renewable Energy, 126, 755–764. https://doi.org/10.1016/j.renene.2018.03.089
- Chen, X., Du, Y., & Wen, H. (2017). Forecasting based power ramp-rate control for PV systems without energy storage. 2017 IEEE 3rd International Future Energy Electronics Conference and ECCE Asia, IFEEC - ECCE Asia 2017, 733–738. https://doi.org/10.1109/IFEEC.2017.7992130
- Dalcalı, A., Çelik, E., & Arslan, S. (2012). Mikro ve mini hidroelektrik santralleri için mikrodenetleyici tabanlı mikrodenetleyici tabanlı bir elektronik governor sisteminin tasarımı. Erciyes Üniversitesi Fen Bilimleri Enstitüsü Dergisi, 28(2), 130–135.
- Datta, D. (2013). Unit commitment problem with ramp rate constraint using a binary-real-coded genetic algorithm. Applied Soft Computing Journal, 13(9), 3873–3883. https://doi.org/10.1016/j.asoc.2013.05.002
- De La Parra, I., Marcos, J., García, M., & Marroyo, L. (2015). Control strategies to use the minimum energy storage requirement for PV power ramp-rate control. Solar Energy, 111, 332–343. https://doi.org/10.1016/j.solener.2014.10.038
- Dorado-Moreno, M., Navarin, N., Gutiérrez, P. A., Prieto, L., Sperduti, A., Salcedo-Sanz, S., & Hervás-Martínez, C. (2020). Multi-task learning for the prediction of wind power ramp events with deep neural networks. Neural Networks, 123, 401–411. https://doi.org/10.1016/j.neunet.2019.12.017
Details
Primary Language
English
Subjects
Electrical Engineering
Journal Section
Research Article
Publication Date
March 15, 2023
Submission Date
September 8, 2022
Acceptance Date
October 24, 2022
Published in Issue
Year 2023 Volume: 26 Number: 1
APA
Karadöl, İ., Avli Fırış, F., & Şekkeli, M. (2023). SEASONAL ASSESSMENT OF RUN-OF-RIVER HYDROELECTRIC POWER PLANT RAMP EVENTS. Kahramanmaraş Sütçü İmam Üniversitesi Mühendislik Bilimleri Dergisi, 26(1), 57-66. https://doi.org/10.17780/ksujes.1172594
Cited By
ASSESSMENT OF ENVIRONMENTAL IMPACTS AND ENVIRONMENTAL FLOW FOR RIVER TYPE HYDROELECTRIC POWER PLANT: THE CASE OF KORKUTELI STREAM (ANTALYA)
Kahramanmaraş Sütçü İmam Üniversitesi Mühendislik Bilimleri Dergisi
https://doi.org/10.17780/ksujes.1457699