ASSESSMENT OF ENVIRONMENTAL IMPACTS AND ENVIRONMENTAL FLOW FOR RIVER TYPE HYDROELECTRIC POWER PLANT: THE CASE OF KORKUTELI STREAM (ANTALYA)
Abstract
Considering Türkiye's morphological structure and river beds, it can be seen that it has not yet reached its equilibrium profile. This profile is an ideal structure for installing hydroelectric power plants (HPP). After renewable energy sources, the most environmentally friendly energy source for the ecosystem is HPP. When determining the amount of water to be used in hydroelectric power plants, the amount of water required for the ecosystem that should be discharged to nature should be calculated. The amount of water needed for the ecosystem to maintain its current structure without change is defined as the environmental flow. In this study, the environmental impact and environmental flow of the Korkuteli Stream HPP Project located within the borders of the Korkuteli District of Antalya Province have been determined. Wetted perimeter, flow duration index (Q25, Q50, Q75, and Q95), and base flow methods have been used to determine the environmental flow of the Korkuteli Stream. In calculating environmental flow 44 years of discharges of the Salamur Strait flow observation station (FOS) on Korkuteli Stream have been used. As a result, the optimal environmental flow was calculated at 17% using the wetted perimeter method.
Keywords
Kaynakça
- Albayrak, S. & Turanlı, M. (2022). Çok kriterli karar verme yöntemleri ile Türkiye'de HES (Hidroelektrik Santral) seçimi. İstanbul Üniversitesi, Fen Bilimleri Dergisi, 21(41), 68-79. https://doi.org/10.55071/ticaretfbd.1113158
- Altınkaya, H. & Yılmaz, M. (2023). Estimation of the daily production levels of a run-of-river hydropower plant using the artificial neural network. Academic Platform Journal of Engineering And Smart Systems (APJESS), 11(2), 62-72. https://doi.org/10.21541/apjess.1223119
- Atalay, Ö. & Yılmaz Ulu, E. Y. (2018). Hydropower capacity of Turkey and actual investments. The Eurasia Proceedings of Science, Technology, Engineering & Mathematics (EPSTEM), (4), 162-166.
- Ates, H., Dogan, S. & Berktay, A. (2016). The effect of river type hydroelectric power plants on aquatic ecosystems: the case study of Göksu River-Eastern Mediterranean. European Journal of Engineering and Natural Sciences, 1(1), 39-46.
- Babacan, H. T. & Yüksek, Ö. (2022). Comparison of environmental impact assesment processes for hydropower plants. Turkish Journal of Hydraulic, 6(1), 12-20.
- Bobat, A. (2023). Small hydropower development in Turkey: An overview on 2021. International Journal of Energy Studies, 8(1), 75-85. https://doi.org/10.58559/ijes.1195975
- Cronin, B. T., Hartley, A. J., Çelik, H., Hurst, A., Türkmen, İ. & Kerey, E. (2000). Equilibrium profile development in graded deep-water slope: Eocenei Eastern Turkey. Journal of the Geological Society, 157, 943-955.
- Çakmak, S., Demir, T. & Aytaç, A. S. (2021). Korkuteli Çayı'nda taşınan eriyik sediman konsantrasyonları ve verimlerinin tahmin edilmesi. Jeomorfolojik Araştırmalar Dergisi, (7), 19-29. https://doi.org/10.46453/jader.893216
Ayrıntılar
Birincil Dil
İngilizce
Konular
İnşaat Geoteknik Mühendisliği , Hidrojeoloji
Bölüm
Araştırma Makalesi
Yazarlar
Yayımlanma Tarihi
3 Aralık 2024
Gönderilme Tarihi
23 Mart 2024
Kabul Tarihi
17 Eylül 2024
Yayımlandığı Sayı
Yıl 2024 Cilt: 27 Sayı: 4
APA
Soyaslan, İ. İ. (2024). ASSESSMENT OF ENVIRONMENTAL IMPACTS AND ENVIRONMENTAL FLOW FOR RIVER TYPE HYDROELECTRIC POWER PLANT: THE CASE OF KORKUTELI STREAM (ANTALYA). Kahramanmaraş Sütçü İmam Üniversitesi Mühendislik Bilimleri Dergisi, 27(4), 1185-1196. https://doi.org/10.17780/ksujes.1457699